Introduction
The existing sewage treatment plant at The Greens residential community in the emirate of Dubai was subject to a major increase in sewerage flow due to a rapid increase in population. There was therefore a need to augment the plant treatment capacity in the shortest possible time to meet the additional load. The job of augmentation however was fraught with many constraints such as:
- Lack of sufficient space for expansion
- The physical limits of a high traffic road at the southern boundary, a school at the eastern side and some infrastructure at the northern and western ends. These limitations presented major challenges in accommodating the plant within the small available footprint and catering for both odor control and aesthetic view of the structures
- The difficult task of integrating the new plant into the existing one without stopping the inflow. which could not be diverted elsewhere
- Incorporating the new equipment into the existing STP structures
Metito took up the challenge and proposed a solution using MBR (Membrane Bioreactor) technology that was a nascent new process in the Arabian Gulf region.
Metito was awarded the multi-million dollar utilities project to increase the treatment capacity of the existing sewage treatment plant at The Greens from 3,000 m3/day to 10,000 m3/day, by employing Membrane Bioreactor technology. The process scheme was developed to make the best possible use of the existing treatment plant structures and add minimal new ones. Project execution involved complying with the international standards and specifications drawn by the consultants. Metito completed this most challenging task to the entire satisfaction of the owner, and the successful operation of this entire complex was subsequently managed by Metito’s efficient and professional workforce.
Scope of Work
This included detailed engineering, manufacture, supply, installation, testing, commissioning, start-up and training of personnel at the site. It also included the operation and maintenance of the plant for a period of three years.
Plant General Information
The sewage treatment facility comprises the following units:
- Inlet works
- Biological Treatment
- Sludge Handling
- Chemical Cleaning
- Electrical and Control System
Plant Technical Characteristics
Raw sewage from the residential community is transferred by a force main then screened before entering the main sewage lift station.
Plant Data Summary
Average daily flow | 10,000 m3/day |
Peak daily design flow | 12,000 m3/day |
Peak factor | 2.5 |
Peak hourly flow | 1,042 m3/hr |
Peak flow duration | 2 hours |
Influent Analysis
Parameter | Unit | Value |
Temperature | C0 | 22-35 |
BOD5 | mg/l | 300 |
COD | mg/l | 700 |
TKN – N | mg/l | 50 |
NH3 – N | mg/l | 40 |
Suspended Solids | mg/l | 325 |
Phosphates | mg/l | 10 |
Alkalinity (Assumed) | mg/l | Min.250 |
Oil & Grease (Assumed) | mg/l | < 25 |
Ph | mg/l | 7 – 8.5 |
Sulphate | mg/l | 90 |
Hydrogen Sulphide | mg/l | 27 |
Effluent Quality
Parameter | Unit | Value |
Temperature | C0 | 22-35 |
BOD5 | mg/l | < 10 |
COD | mg/l | < 50 |
TKN – N | mg/l | < 5 |
NH3 – N | mg/l | < 3 |
Suspended Solids | mg/l | < 10 |
Total N | mg/l | < 30 |
Total coliform | mg/l | < 10c/100 ml |